Processing Rubber

Processing Rubber

Compression moulded and some injection moulded parts require deflashing. This is done in various ways depending upon the shape and size of the component and the type of rubber used.

Sub-Zero Finishing

The most modern and efficient method of finishing uses cryogenics. Parts are frozen to temperatures as low as -120°C and then tumbled and/or bead-blasted while cold to remove the brittle flash. The machines are individually programmed with the optimum temperature and running times for each particular type and number of components, which are tested and proven during the development stages.

Tear Finishing

The tool is designed to produce a very thin section of flash around the part which is torn off at the press during de-moulding.

If required, components can also be hand finished by the following methods:

Buffing

Parts can be smoothed using a variety of abrasive belts, wheels and mops.

Cutting

Parts are die cut by machine using a range of tools from precision steel knives to wood-formes, or in extreme cases are trimmed with scissors. Compression moulded and some injection moulded parts require deflashing. This is done in various ways depending upon the shape and size of the component and the type of rubber used.

Member Testimonials

ONGC – Oil and Natural Gas Corporation Limited

"ONGC - Oil and Natural Gas Corporation Limited" - Our complex drilling application where Shaft was eccentric and application was robust & muddy. Replacement was never easy. Mech Spares designed Oil seals resolved difficulty. This gave a complete joy to my maintenance team.
2014-06-08T07:48:57+00:00
“ONGC – Oil and Natural Gas Corporation Limited” – Our complex drilling application where Shaft was eccentric and application was robust & muddy. Replacement was never easy. Mech Spares designed Oil seals resolved difficulty. This gave a complete joy to my maintenance team.

Kuwait National Petroleum Company

"Mr Mohammed Al Duaigy" of (Kuwait National Petroleum Company) : We tried several diaphragms from renown worldwide Rubber manufacturing companies. We found Mech Spares technical know how and product to be of great durability and lasted 3 times more then anticipated. They have accurate understanding of there products.
2014-06-08T07:49:23+00:00
“Mr Mohammed Al Duaigy” of (Kuwait National Petroleum Company) : We tried several diaphragms from renown worldwide Rubber manufacturing companies. We found Mech Spares technical know how and product to be of great durability and lasted 3 times more then anticipated. They have accurate understanding of there products.

McCafferty BM Design Ltd, KENT United Kingdom

"McCafferty BM Design Ltd, KENT United Kingdom" - Most of the O rings manufacturing company suggested to use larger diameter and expensive elastomers. We learnt with Mech Spares that elastomer being weaker compare to metal and alloys and needs appropriate back up for high pressure or high vacuum applications. Further not necessary the most expensive elastomer is the best for all applications. We trust Mr Nilesh chodhari completely for all our O rings designing applications.
2014-06-08T07:50:26+00:00
“McCafferty BM Design Ltd, KENT United Kingdom” – Most of the O rings manufacturing company suggested to use larger diameter and expensive elastomers. We learnt with Mech Spares that elastomer being weaker compare to metal and alloys and needs appropriate back up for high pressure or high vacuum applications. Further not necessary the most expensive View Full →

Bhabha Atomic Research Centre ( BARC )

"Dr. A. Singh" of BARC: The electric Insulation mat manufactured by MECH SPARES as per IS 15624 tested at ERTL and found to withstand 40 Kv and still didn't tear. We have been using since 5 years and still didn't generate any fatigue. They arranged bulk delivery in short period.
2014-06-08T07:16:20+00:00
“Dr. A. Singh” of BARC: The electric Insulation mat manufactured by MECH SPARES as per IS 15624 tested at ERTL and found to withstand 40 Kv and still didn’t tear. We have been using since 5 years and still didn’t generate any fatigue. They arranged bulk delivery in short period.

Tata Steel

"Tata Steel" - One of our old machines started making loud noise and disturbed the entire village. We were compelled to stop the machines which lead to huge production loss. With the help of Mech Spares designed bellows in two part we could retain the lubrication and eliminate the noise.
2014-06-08T07:17:16+00:00
“Tata Steel” – One of our old machines started making loud noise and disturbed the entire village. We were compelled to stop the machines which lead to huge production loss. With the help of Mech Spares designed bellows in two part we could retain the lubrication and eliminate the noise.
View O Ring Reference Chart